Author:
Vrba Pavel,Harcuba Ondřej,Klíma Martin,Mařík Vladimír
Publisher
Springer International Publishing
Reference28 articles.
1. Dreamliner Grounded Until At Least End Of May. In: Sky News, February 25, 2013 (accessed June 12th 2015).
http://news.sky.com/story/1056514/dreamliner-grounded-until-at-least-end-of-may
2. Kingsley, J.M.: Airbus slows A380 final assembly ramp-up. In: Flightglobal, May 14, 2009 (access February 25th 2013).
www.flightglobal.com/news/articles/airbus-slows-a380-final-assembly-ramp-up-326416/
3. Jain, A.S., Meeran, S.: Deterministic job-shop scheduling: Past, present and future. European Journal of Operational Research 113(2), 390–434 (1999)
4. Adams, J., Balas, E., Zawack, D.: The shifting bottleneck procedure for job shop scheduling. Management Science 34(3), 391–401 (1988)
5. Amico, M.D., Trubian, M.: Applying tabu search to the job-shop scheduling problem. Annals of Operations Research 41(3), 231–252 (1993)
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献