Author:
Romeser Carolin,Roser Christoph
Publisher
Springer International Publishing
Reference11 articles.
1. Roser, C., Lorentzen, K., Deuse, J.: Reliable shop floor bottleneck detection for flow lines through process and inventory observations: the bottleneck walk. Logist. Res. 8(1) (2015)
2. Law, A.M., Kelton, W.D.: Simulation Modeling and Analysis, 2nd edn. McGraw-Hill, New York (1991)
3. Elmasry, G., McCann, C.: Bottleneck discovery in large-scale networks based on the expected value of per-hop delay, vol. 1, pp. 405–410 (2003)
4. Roser, C., Lorentzen, K., Deuse, J.: Reliable shop floor bottleneck detection for flow lines through process and inventory observations. Procedia CIRP 19, 63–68 (2014)
5. Li, L., Chang, Q., Ni, J., Xiao, G., Biller, S.: Bottleneck detection of manufacturing systems using data driven method, pp. 76–81 (2007)
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Digital Twin-based bottleneck prediction for improved production control;Computers & Industrial Engineering;2024-06
2. Bottleneck Prediction Using the Active Period Method in Combination with Buffer Inventories;Advances in Production Management Systems. The Path to Intelligent, Collaborative and Sustainable Manufacturing;2017