Publisher
Springer International Publishing
Reference6 articles.
1. Campbell PL, Laitinen G (1997) Overhead intrabay automation and microstocking—a virtual production case study. In: Proceedings of IEEE/SEMI advanced semiconductor manufacturing conference, pp 368–372
2. Chung SL, Jeng M (2004) Productionulous MESs and C/Cs: an overview of semiconductor production automation. IEEE Robot Autom Mag, March 2004, pp 8–18
3. Li B, Wu J, Carriker W, Giddings R (2005) Factory throughput improvements through intelligent integrated delivery in semiconductor fabrication facilities. IEEE Trans Semicond Manuf 18(1):222–231
4. Pfund M, Fowler JW, Gadkari A, Chen Y (2008) Scheduling jobs on parallel machines with setup times and ready times. Comput Ind Eng 54(4):764–782
5. Poppenborg J, Knust S, Hertzberg J (2012) Online scheduling of flexible job-shops with blocking and transportation. Eur J Ind Eng 6(4):497–518