Author:
Gay Steven,Schaus Pierre,De Smedt Vivian
Publisher
Springer International Publishing
Reference19 articles.
1. Atighehchian, A., Bijari, M., Tarkesh, H.: A novel hybrid algorithm for scheduling steel-making continuous casting production. Computers & Operations Research 36(8), 2450–2461 (2009)
2. Baptiste, P., Pape, C.L., Nuijten, W.: Constraint-based scheduling: applying constraint programming to scheduling problems, vol. 39. Springer (2001)
3. Carchrae, T., Beck, C.: Principles for the design of large neighborhood search. Journal of Mathematical Modelling and Algorithms 8(3), 245–270 (2009)
4. Frisch, A.M., Miguel, I., Walsh, T.: Modelling a steel mill slab design problem. In: Proceedings of the IJCAI 2001 Workshop on Modelling and Solving Problems with Constraints, Citeseer (2001)
5. Lecture Notes in Computer Science;A. Gargani,2007
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献