Publisher
Springer International Publishing
Reference6 articles.
1. Lin, D., Lee, C.K.: A review of the research methodology for the re-entrant scheduling problem. Int. J. Prod. Res. 8(49), 2221–2242 (2011)
2. Dong, M., He, F.: A new continuous model for multiple re-entrant manufacturing system. Eur. J. Oper. Res. 7(2), 659–668 (2012)
3. Jianyou, X., Yin, Y., et al.: A memetic algorithm for the re-entrant permutation flowshop scheduling problem to minimize the makespan. Appl. Soft Comput. 11(24), 277–283 (2014)
4. Jing, C., Huang, W., Tang, G.: Minimizing total completion time for re-entrant flow shop scheduling problems. Theoret. Comput. Sci. 412, 6712–6719 (2011)
5. Armbruster, D., Ringhofer, C.: Thermalized kinetic and fluid models for re-entrant supply chains. SIAM J. Multiscale Model. Simul. 3(1), 782–800 (2005)