1. BenHassine, A., & Ho, T. B. (2007). An agent-based approach to solve dynamic meeting scheduling problems with preferences. Engineering Applications of Artificial Intelligence, 20(6), 857–873.
2. Berger, F., Klein, R., Nussbaum, D., Sack, J. R., & Yi, J. (2009). A meeting scheduling problem respecting time and space. GeoInformatica, 13(4), 453–481.
3. Bouhouch, A., Chakir, L., & El Qadi, A. (2016). Scheduling meeting solved by neural network and min-conflict heuristic. In 2016 4th IEEE International Colloquium on Information Science and Technology (CiSt) (pp. 773–778). New York: IEEE.
4. Chun, A., Wai, H., & Wong, R. Y. (2003). Optimizing agent-based meeting scheduling through preference estimation. Engineering Applications of Artificial Intelligence, 16(7), 727–743.
5. Davenport, A., Tsang, E., Wang, C. J., Zhu, K. (1994). Genet: A connectionist architecture for solving constraint satisfaction problems by iterative improvement. In AAAI (pp. 325–330).