Publisher
Springer International Publishing
Reference51 articles.
1. Aggarwall SC (1985) MRP, JIT, OPT, FMS? Making sense of production operations systems. Harv Bus Rev 63(5):8–16
2. Atwater JB, Chakravorty SS (2002) A study of the utilization of capacity constrained resources in drum–buffer–rope systems. Prod Oper Manag 11(2):259–273
3. Bauer A, Bowden R, Browne J, Duggan J, Lyons G (1994) Shop floor control systems—from design to implementation. Chapman & Hall, London
4. Bhardwaj A, Gupta A, Kanda A (2010) Drum–buffer–rope: the technique to plan and control the production using theory of constraints. In: Proceedings of World Academy of Science, Engineering and Technology, vol 70, pp 103–106
5. Blackstone JH (2001) Theory of constraints—a status report. Int J Prod Res 39(6):1053–1080
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献