Author:
Büscher Christian,Hauck Eckart,Schilberg Daniel,Jeschke Sabina
Publisher
Springer International Publishing
Reference32 articles.
1. Mayer, M., C. Schlick, D. Ewert, D. Behnen, S. Kuz, B. Odenthal, and B. Kausch. 2011. Automation of robotic assembly processes on the basis of an architecture of human cognition. Production Engineering Research and Development 5 (4): 423–431. (ISSN 0944-6524)
2. Pufall, Andreas, Jan C. Fransoo, and A. G. de Kok. 2007. What determines product ramp-up performance? A review of characteristics based on a case study at Nokia mobile phones. BETA publicaties. Working paper no. 228 [Beta, Research School for Operations Management and Logistics], Technische Universiteit Eindhoven.
3. Winkler, Helge, Michael Heins, and Peter Nyhuis. 2007. A controlling system based on cause-effect relationships for the ramp-up of production systems. Production Engineering – Research and Development 1 (1): 103–111.
4. Schuh, Günther, Wolfgang Stölzle, and Frank Straube. 2008. Grundlagen des Anlaufmanagements: Entwicklungen und Trends, Definitionen und Begriffe, Integriertes Anlaufmanagementmodell. In Anlaufmanagement in der Automobilindustrie erfolgreich umsetzen, ed. Günther Schuh, Wolfgang Stölzle, and Frank Straube. 1–6. Berlin: VDI-Buch, Springer.
5. Ball, P. D., S. Roberts, A. Natalicchio, and C. Scorzafave. 2011. Modelling production ramp-up of engineering products. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 225 (6): 959–971.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献