1. Asta, S., Karapetyan, D., Kheiri, H., Ozcan, E., Parkes, A.J.: Combining monte-carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem. In: Kendall, G., Berghe, G.V., McCollum, B. (eds.) Proceedings of the 6th Multidisciplinary International Scheduling Conference, (in review), pp. 836–839 (2013)
2. Baker, J.E.: Reducing bias and inefficiency in the selection algorithm. In: Proceedings of the 2nd International Conference on GA, pp. 14–21. Lawrence Erlbaum Associates, Inc., Mahwah, NJ, USA (1987)
3. da Fonseca, G.H.G., Santos, H.G., Toffolo, T.A.M., Brito, S.S., Souza, M.J.F.: GOAL solver: a hybrid local search based solver for high school timetabling. Ann. Oper. Res. 239(1), 77–97 (2014)
4. Demeulemeester, E.L., Herroelen, W.S.: Project Scheduling: A Research Handbook. Kluwer Academic Publishers, Norwell (2002)
5. Hansen, P., Mladenović, N.: First vs. best improvement: an empirical study. Discrete Appl. Math. 154(5), 802–817 (2006)