1. Björk, K.-M.: The economic production quantity problem with a finite production rate and fuzzy cycle time. In: Proceedings of the 41th Annual Hawaii International Conference on System Sciences (HICSS 2008), pp. 68–68. IEEE (2008)
2. Björk, K.-M.: A Multi-item Fuzzy Economic Production Quantity Problem with a Finite Production Rate. Int. J. Prod. Econ. 135, 702–707 (2012)
3. Björk, K.-M., Carlsson, C.: The Outcome of Imprecise Lead Times on the Distributors. In: Proceedings of the 38th Annual Hawaii International Conference on System Sciences (HICSS 2005), pp. 81–90. IEEE (2005)
4. Björk, K.-M., Carlsson, C.: The Effect of Flexible Lead Times on a Paper Producer. Int. J. Prod. Econ. 107, 139–150 (2007)
5. Carlsson, C., Fullér, R.: Soft computing and the Bullwhip effect. Econ. Comp. 2(3), 1–26 (1999)