1. Orłowski, K.A., Walichnowski, A.: Economic analysis of upper layer production of engineered floorings (in Polish). Wood. Res. Pap. Rep. Announ. (Drewno) 56(189), 115–126 (2013)
2. Kłos, S., Patalas-Maliszewska, J.: throughput analysis of automatic production lines based on simulation methods. In: Jackowski, K., Burduk, R., Walkowiak, K., Wozniak, M., Yin, H. (eds.) Intelligent Data Engineering and Automated Learning – IDEAL. Lecture Notes in Computer Science, vol. 9375, pp. 81–190 (2015)
3. Vieira, G., Reis, L., Varela, M.L.R., Machado, J., Trojanowska, J.: Integrated platform for real-time control and production and productivity monitoring and analysis. Rom. Rev. Prec. Mech. Opt. Mechatr. 50, 119–127 (2016)
4. Grzybowska, K., Gajdzik, B.: Optimisation of equipment setup processes in enterprises. Metalurgija 51(4), 563–566 (2012)
5. Krenczyk, D., Jagodzinski, M.: ERP, APS and simulation systems integration to support production planning and scheduling. Advances in Intelligent Systems and Computing, vol. 368, pp. 451–461 (2015)