Author:
Behr Carina M.,Grobler Jacomine
Publisher
Springer International Publishing
Reference20 articles.
1. Auger, A., Hansen, N.: A restart CMA evolution strategy with increasing population size. In: Proceedings of the 2005 IEEE Congress on Evolutionary Computation, pp. 1769–1776 (2005)
2. Tang, L.X., Liu, P.: Two-machine flow shop scheduling problems involving a batching machine with transportation or deterioration consideration. Appl. Math. Model. 33, 1187–1199 (2009)
3. Li, X., Chan, F.T.S., Chung, S.H.: Optimal multi-degree scheduling of multiple robots without overlapping in robotic flow shops with parallel machines. J. Manufact. Syst. 36, 62–75 (2015)
4. Majumder, A., Laha, D.: A new cuckoo search algorithm for 2-machine robotic cell scheduling problem with sequence-dependent setup times. Swarm Evol. Comput. 28, 131–143 (2016)
5. Lim, J.M.: A genetic algorithm for a single hoist scheduling in the printed-circuit-board electroplating line. Comput. Ind. Eng. 33(3–4), 789–792 (1997)