1. Ait El Cadi, A.: Automatisation de la parallèlisation de systémes complexes avec application à l’environnement Matlab/Simulink. MS Thesis, École Polytechnique de Montréal (2004)
2. Ait El Cadi, A., Ben Atitallah, R., Hanafi, S., Mladenović, N., Artiba, A.: New MIP model for multiprocessor scheduling problem with communication delays. Optimization Letters, 11(6), 1091–1107 (2017)
3. Ali, H.H., El-Rewini, H.: An optimal algorithm for scheduling interval ordered tasks with communication on N processor, University of Nebraska at Omaha, Mathematics and Computer Science Department, Technical Report, 91-20 (1990)
4. Baker, K.R., Trietsch, D.: Principles of Sequencing and Scheduling. Wiley, Hoboken (2009)
5. Banharnsakun, A., Sirinaovakul, B., Achalakul, T.: Job Shop Scheduling with the Best-so-far ABC. Eng. Appl. Artif. Intell. 25(3), 583–593 (2012)