Author:
Kristjanpoller Rodríguez Fredy,Crespo Márquez Adolfo,Viveros Gunckel Pablo,Barberá Martínez Luis
Publisher
Springer International Publishing
Reference33 articles.
1. Asaki Z (1992) Kinetic studies of copper flash smelting furnace and improvements of its operation in the smelters in Japan. Miner Process Extr Metall 11:163–185
2. Parra C (2009) Desarrollo de modelos de cuantificación económica del factor Fiabilidad en el coste total de ciclo de vida de un sistema de producción. Universidad de Sevilla, Spain, Tesis Doctoral
3. Pham H (2003) Handbook of reliability engineering, 2003rd edn. Springer, New jersey
4. Viveros P, Zio E, Arata A, Kristjanpoller F (2012) Integrated system reliability and productive capacity analysis of a production line. A case study for a Chilean mining process. Proc Inst Mech Eng Part O J Risk Reliab 226:305–317. doi: 10.1177/1748006X11408675
5. Dhillon BS (2006) Maintainability, maintenance, and reliability for engineers. Taylor & Francis Group, Boca Raton