Author:
Bożejko Wojciech,Chaczko Zenon,Nadybski Piotr,Wodecki Mieczysław
Publisher
Springer International Publishing
Reference20 articles.
1. Bozoki, G., Richard, J.-P.: A branch-and-bound algorithm for the continous-process job-shop scheduling problem. AIIE Trans. 2(3), 246–252 (1970)
2. Błażewicz, J., Drabowski, M., Węglarz, J.: Scheduling multiprocessor tasks to minimize schedule length. IEEE Trans. Comput. 35(5), 389–393 (1986)
3. Błądek, I., Drozdowski, M., Guinand, F., Schepler, X.: On contiguous and non-contiguous parallel task scheduling. J. Sched. 18(5), 487–495 (2015)
4. Bożejko, W., Uchroński, M., Wodecki, M.: Block approach to the cyclic flow shop scheduling. Comput. Ind. Eng. 81, 158–166 (2015)
5. Bożejko, W., Nadybski, P., Wodecki, M.: Scheduling tasks for a computing cluster. In: Knosala, R. (ed.) Innovation in Management and Production Engineering, pp. 524–533. Publishing House of the Polish Society for Production Management (2017). ISBN 978-83-941281-1-1
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. QoS-Aware Dynamical Resource Scheduling in Cloud Data Centers;Security, Privacy, and Anonymity in Computation, Communication, and Storage;2021