1. Agilepirate (2011)
http://www.theagilepirate.net
(2011) Swimlane sizing—complete and fast backlog estimation. Retrieved from
http://theagilepirate.net/archives/109
2. Ambler SW (2009) The Agile Scaling Model (ASM): adapting Agile Methods for complex environments. Retrieved from
ftp://ftp.software.ibm.com/common/ssi/sa/wh/n/raw14204usen/RAW14204USEN.PDF
3. Beck K (2000) Extreme programming explained: embrace change. Addison-Wesley Longman Publishing, Boston, MA
4. Beck K, Beedle M, van Bennekum A, Cockburn A, Cuningham W, Fowler M, Grenning J, Highsmith J, Hunt A, Jeffries R, Kern J, Marick B, Martin RC, Mallor S, Shwaber K, Sutherland J (2001) The Agile manifesto. Technical report. The Agile Alliance
5. Carleton T, Leifer L (2009) Stanford’s ME310 course as an evolution of engineering design. In: Proceedings of the 19th CIRP design conference—competitive design. Cranfield, UK