1. Barták, R., Jaška, M., Novák, L., Rovenský, V., Skalický, T., Cully, M., Sheahan, C., Thanh-Tung, D.: Flowopt: Bridging the gap between optimization technology and manufacturing planners. In: De Raedt, L., et al. (eds.) Proceedings of 20th European Conference on Artificial Intelligence (ECAI 2012), pp. 1003–1004. IOS Press (2012)
2. Dechter, R., Meiri, I., Pearl, J.: Temporal constraint networks. Artif. Intell. 49, 61–95 (1991)
3. Andersen, E.D., Andersen, K.D.: The mosek interior point optimizer for linear programming: an implementation of the homogeneous algorithm. In: Frenk, H., Roos, K., Terlaky, T., Zhang, S. (eds.) High Performance Optimization, pp. 197–232. Springer, USA (2000)
4. Raheja, A.S., Subramaniam, V.: Reactive recovery of job shop schedules - a review. Int. J. Adv. Manuf. Technol. 19, 756–763 (2002)
5. Vieira, G., Herrmann, J., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Sched. 6, 39–62 (2003)