1. Bowles, J.B., Pelaez, C.E.: Fuzzy logic prioritization of failures in a system failure mode, effects and criticality analysis. Reliab. Eng. Syst. Saf. 50(2), 203–213 (1995)
2. Bożejko, W., Hejducki, Z., Rajba, P., Wodecki, M.: Project management in building process with uncertain tasks times. Manag. Prod. Eng. Rev. 2(1), 3–9 (2011)
3. Lecture Notes in Computer Science;A Burduk,2011
4. Burduk, A., Chlebus, E.: Methods of risk evaluation in manufacturing systems. Arch. Civ. Mech. Eng. 9(3), 17–30 (2009)
5. Chrysler Cooperation, Ford Motor Company, General Motors Cooperation: Potential Failure Mode and Effects Analysis (FMEA), First Edition Issued, February 1993