1. Abdelzaher TF, Lu C (2001) Schedulability analysis and utilization bounds for highly scalable real-time services. In: 7th IEEE real-time technology and applications symposium, May/June 2001, Taipei, Taiwan, pp 15–25
2. Abdelzaher TF, Sharma V (2003) A synthetic utilization bound for aperiodic tasks with resource requirements, July 2003, Porto, Portugal
3. Abdelzaher TF, Andersson B, Johnsson J, Sharma V, Nguen M (2002) The aperiodic multiprocessor utilization bound for liquid tasks. In: 7th IEEE real-time technology and applications symposium, September 2002, San Jose, USA, pp 173–184
4. Andersson B (2000) Synthetic utilization in online aperiodic scheduling. In: IEEE real-time systems symposium, work-in-progress session, December 2000, Cancun, Mexico
5. Andersson B, Baruah S, Jonsson J (2001) Static-priority scheduling on multiprocessors. In: IEEE real-time systems symposium, Dec. 3–6, 2001, London, pp 193–202