1. Austin, S., Baldwin, A., Li, B., Waskett, P.: Analytical Design Planning Technique (ADePT). A Dependency Structure Matrix Tool to Schedule the Building Design Process. Construction Management and Economics 2, 173–182 (2000)
2. Brickley, J.A., Smith, C.W., Zimmerman, J.: Managerial Economics & Organizational architecture. Mc Graw-Hill/ Irwin, New York, USA (2003)
3. Castro, J., Kolp, M., Mylopoulos, J.: Towards requirements-driven information systems engineering. The Tropos project. Information Systems 6, 365–389 (2002)
4. Crowe, T.J., Fong, P.M., Bauman, T.A., Zayas-Castro, J.L: Quantitative Risk Level Eestimation of Business Process Reengineering Efforts. Business Process Management Journal 5, 490–511 (2002)
5. Davenport, T.H., Stoddard, D.B.: Reengineering: business change of mythic proportions? MIS Quarterly. June, 121-127 (1994)