1. AVISO (1996): User Handbook-Merged TOPEX/Poseidon Products (GDR-M), AVI-NT-02-101-CN, Ed. 3.0, July 1996
2. AVISO and PODAAC (2003): User Handbook-IGDR and GDR Jason-1 Products, SMM-MU-M5-OP-13184-CN, Ed. 2.0, April 2003
3. Bosch W., J. Klokočnik, C. Wagner, J. Kostelecky (2000): Geosat and ERS-1 datum offsets relative to Topex/Poseidon estimated simultaneously with geopotential corrections from multi-satellite crossover altimetry. In: Rummel, R., H. Drewes, W. Bosch, H. Hornik (Eds.): Towards an Integrated Global Geodetic Observing System (IGGOS). IAG Symposia (120) 96–98, Springer, Berlin.
4. Bosch W. (2005): Simultaneous crossover adjustment for contemporary altimeter missions. ESA-ESTEC, SP 572, ESA/ESTEC
5. Bosch W. (2006): Discrete Crossover Analysis. In: Rizos, Ch. and P. Tregoning (Eds.) Dynamic Planet 2005. IAG Symposia, Vol. 13?, Springer, Berlin (this volume)