Author:
Lim Andrew,Rodrigues Brian,Xu Zhou
Publisher
Springer Berlin Heidelberg
Reference13 articles.
1. Bish, E.K., Leong, T.-Y., Li, C.-L., Ng, J.W.C., Simchi-Levi, D.: Analysis of a new vehicle scheduling and location problem. Naval Research Logistics 48(5), 363–385 (2001)
2. Brucker, P.: Scheduling Algorithms. Springer, Heidelberg (1995)
3. Daganzo, C.F.: The crane scheduling problem. Transportation Research B 23(3), 159–175 (1989)
4. Garey, M.R., Johnson, D.S.: Computers and intractability: a guide to the theory of NP-completeness. Freeman, New York (1983)
5. Ge, Y., Yih, Y.: Crane scheduling with time windows in circuit board production lines. International Journal of Production Research 33(5), 1187–1189 (1995)
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献