1. Abela, J., Abramson, D., Krishnamoorthy, M., de Silva, A., and Mills, G. (1993). Computing optimal schedules for landing aircraft. In Proceedings of the 12th National Conference of the Australian Society for Operations Research, Adelaide, pages 71–90. Available at: http://www.csse.monash.edu.au/~davida/papers/asorpaper.pdf [30 March 2004].
2. Anagnostakis, I. and Clarke, J.-P. (2002). Runway operations planning, a two-stage heuristic algorithm. In AIAA Aircraft, Technology, Integration and Operations Forum, Los Angeles, CA. Available at: http://icat-server.mit.edu/Library/Download/167/_paper0024.pdf [30 March 2004].
3. Anagnostakis, I. and Clarke, J.-P. (2003). Runway operations planning, a two-stage methodology. In Proceedings of the 36th Hawaii International Conference on System Sciences (HICSS-36), Hawaii.
4. Anagnostakis, I., Clarke, J.-P., Böhme, D., and Völckers, U. (2001). Runway operations planning and control, sequencing and scheduling. In Proceedings of the 34th Hawaii International Conference on System Sciences (HICSS-34), Hawaii.
5. Anagnostakis, I., Idris, H. R., Clarke, J.-P., Feron, E., Hansman, R. J., Odoni, A. R., and Hall, W. D. (2000). A conceptual design of a departure planner decision aid. In 3rd FAA/Eurocontrol International Air Traffic Management R & D Seminar, ATM-2000, Naples, Italy. Available at: http://atm-seminar-2000.eurocontrol.fr/acceptedpapers/pdf/paper68.pdf [30 March 2004].