Minimizing the total tardiness and job rejection cost in a proportionate flow shop with generalized due dates
Author:
Publisher
Springer Science and Business Media LLC
Subject
Artificial Intelligence,Management Science and Operations Research,General Engineering,Software
Link
https://link.springer.com/content/pdf/10.1007/s10951-021-00697-4.pdf
Reference29 articles.
1. Chubanov, S., Kovalyov, M., & Pesch, E. (2006). An FPTAS for a single-item capacity economic lot-sizing problem with monotone cost structure. Mathematical Programming, Series A, 106, 453–466.
2. Cordone, R., Hosteins, P., & Righini, G. (2017). A branch-and-bound algorithm for the prize-collecting single-machine scheduling problem with deadlines and total tardiness minimization. INFORMS Journal on Computing, 30(1), 168–180.
3. Cordone, R., & Hosteins, P. (2019). A bi-objective model for the single-machine scheduling problem with rejection cost and total tardiness minimization. Computers and Operations Research, 102, 130–140.
4. Du, W., Eppstein, D., Goodrich, M. T., & Lueker, G. S. (2009). On the approximability of geometric and geographic generalization and the min-max bin covering problem. In F. Dehne, M. Gavrilova, J. R. Sack, & C. D. T òth (Eds.) Algorithms and Data Structures. WADS. Lecture Notes in Computer Science (Vol. 5664). Springer.
5. Du, J., & Leung, J. Y. T. (1990). Minimizing Total Tardiness on One Machine is NP-hard. Mathematics of Operations Research, 15, 483–495.
Cited by 13 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Minimizing the number of tardy jobs with generalized due-dates and position-dependent processing times;Optimization Letters;2024-09-13
2. Research on two-machine flow shop scheduling problem with release dates and truncated learning effects;Engineering Optimization;2024-08-14
3. Single machine scheduling with generalized due-dates, learning effect, and job-rejection;Journal of Applied Mathematics and Computing;2024-08-06
4. A review and classification of scheduling objectives in unpaced flow shops for discrete manufacturing;Journal of Scheduling;2023-11-06
5. Minimizing Total Weighted Late Work in a Proportionate Flow Shop with Job Rejection;Asia-Pacific Journal of Operational Research;2023-07-10
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3