1. Adams, J., Balas, E., & Zawack, D. (1988). The shifting bottleneck procedure for job shop scheduling. Management Science, 34(3), 391–401.
2. Asadathorn, N. (1997). Scheduling of assembly type of manufacturing systems: algorithms and systems developments. PhD thesis, Department of Industrial Engineering, New Jersey Institute of Technology, Newark, NJ.
3. Avci, S., & Storer, R. (2004). Compact local search neighborhoods for generalized scheduling. Working paper.
4. Bulbul, K. (2002). Just-in-time scheduling with inventory holding costs. PhD thesis, University of California at Berkeley.
5. Bulbul, K. (2011). A hybrid shifting bottleneck-tabu search heuristic for the job shop total weighted tardiness problem. Computers & Operations Research, 38(6), 967–983. http://dx.doi.org/10.1016/j.cor.2010.09.015