Author:
Steiner George,Xue Zhihui
Publisher
Springer Science and Business Media LLC
Subject
Artificial Intelligence,Management Science and Operations Research,General Engineering,Software
Reference6 articles.
1. Drobouchevitch, I. G. and V. A. Strusevich, “A heuristic algorithm for two-machine re-entrant shop scheduling,” Annals of Operations Research, 86, 417–439 (1999).
2. Hall, N. G., T.-E. Lee and M. E. Posner, “The complexity of cyclic shop scheduling problems,” Journal of Scheduling, 5, 307–327 (2002).
3. Lee, T.-E. and M. E. Posner, “Performance measures and schedules in periodic job shops,” Operations Research, 45, 72–91 (1997).
4. Lev, V. and I. Adiri, “V-shop scheduling,” European Journal of Operational Research, 18, 51–56 (1984).
5. Steiner, G. and Z. Xue, “On minimizing cycle time in a two-machine job shop,” Working Paper, School of Business, McMaster University, Canada, 2004.
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献