Publisher
Springer Science and Business Media LLC
Subject
Artificial Intelligence,Management Science and Operations Research,General Engineering,Software
Reference14 articles.
1. Cheng, T. C. E., Chen, Z. L., & Li, C. L. (1996). Single-machine scheduling with trade-off between number of tardy jobs and resource consumption. Operations Research Letters, 19, 237–242.
2. Graham, R. L., Lawler, E. L., Lenstra, J. K., & Rinnooy Kan, A. H. G. (1979). Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 5, 287–326.
3. Hoogeveen, H., & Woeginger, G. J. (2002). Some comments on sequencing with controllable processing times. Computing, 68, 181–192.
4. Jackson, J. R. (1955). Scheduling a production line to minimize maximum tardiness. Management sciences research project, research report 43, UCLA.
5. Kaspi, M., & Shabtay, D. (2005). A bicriterion approach to time/cost trade-offs in scheduling with convex resource-dependent job processing times and release dates. Computers and Operations Research, 33(10), 3015–3033.
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献