Publisher
Springer Science and Business Media LLC
Subject
Artificial Intelligence,Management Science and Operations Research,General Engineering,Software
Reference25 articles.
1. Al-Anzi, F. S., & Allahverdi, A. (2006). A hybrid Tabu search heuristic for the two-stage assembly scheduling problem. International Journal of Operations Research, 3(2), 109–119.
2. Al-Anzi, F. S., & Allahverdi, A. (2007). A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times. European Journal of Operational Research, 182(1), 80–94.
3. Al-Anzi, F. S., & Allahverdi, A. (2009). Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan. Computers & Operations Research, 36(9), 2682–2689.
4. Alfieri, A., Glass, C., & van de Velde, S. (2012). Two-machine lot streaming with attached setup times. IIE Transactions, 44(8), 695–710.
5. Allahverdi, A., & Al-Anzi, F. S. (2006). Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times. International Journal of Production Research, 44(22), 4713–4735.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献