Publisher
Springer Science and Business Media LLC
Subject
Artificial Intelligence,Management Science and Operations Research,General Engineering,Software
Reference19 articles.
1. Adiri, I., & Pohoryles, D. (1982). Flowshop/no-idle or no-wait scheduling to minimize the sum of completion times. Naval Research Logistics, 29, 495–504.
2. Agnetis, A., Nicolò, F., & Lucertini, M. (1989). Just-in-time scheduling in a pipeline manufacturing system. In Proceedings of the IFAC/CIRP/IFIP/IFORS Workshop on Decisional Structures in Automated Manufacturing (pp. 81–87).
3. Allahverdi, A. (2016). A survey of scheduling problems with no-wait in process. European Journal of Operational Research, 255, 665–686.
4. Baptiste, P., & Lee, K. H. (1997). A branch and bound algorithm for the
$$F | no-idle | C_{\max }$$
F
|
n
o
-
i
d
l
e
|
C
max
. Proceedings of the International Conference on Industrial Engineering and Production Management, 1, 429–438.
5. Chrétienne, P. (2014). On scheduling with the non-idling constraint. 4OR, 12, 101–121.
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献