1. Adams, J., Balas, E., & Zawack, D. (1988). The shifting bottleneck procedure for job shop scheduling. Management Science, 34(3), 391–401.
2. Akturk, M. S., & Gorgulu, E. (1999). Match-up scheduling under a machine breakdown. European Journal of Operational Research, 112, 81–97.
3. Allen, J. (1981). An interval based representation of temporal knowledge. In Proceedings of the 7th IJCAI, Vancouver, Canada (pp. 221–226).
4. Aloulou, M. A., Portmann, M.-C., & Vignier, A. (2002). Predictive-reactive scheduling for the single machine problem. In 8th Workshop on Project Management and Scheduling, Valencia, 3–5 April 2002 (pp. 39–42).
5. Artigues, C., & Roubellat, F. (1999). Characterization of a set of schedules in resource-constrained multi-project scheduling problem. International Journal of Industrial Engineering—Theory Applications and Practice, 6(2), 112–122.