1. Akyol, D., & Bayhan, G. (2008). Multi-machine earliness and tardiness scheduling problem: An interconnected neural network approach. The International Journal of Advanced Manufacturing Technology, 37(5–6), 576–588.
2. Amorim, R. (2013). Um estudo sobre formulações matemáticas e estratégias algorítmicas para problemas de escalonamento em máquinas paralelas com penalidades de antecipação e atraso. Master’s thesis, Programa de Pós-Graduação em Informática, Instituto de Computação, Universidade Federal do Amazonas, Manaus, AM, Brazil (in Portuguese).
3. Amorim, R., Dias, B., de Freitas, R., & Uchoa, E. (2013). A hybrid genetic algorithm with local search approach for e/t scheduling problems on identical parallel machines. In: Proceedings of the 15th annual conference companion on genetic and evolutionary computation, ACM, New York, NY, USA, GECCO ’13 Companion, pp. 63–64.
4. Anghinolfi, D., & Paolucci, M. (2007). Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach. Computers & Operations Research, 34(11), 3471–3490.
5. Anghinolfi, D., & Paolucci, M. (2008). A new ant colony optimization approach for the single machine total weighted tardiness scheduling problem. International Journal of Operations Research, 5, 44–60.