1. Ankenman BE, Bekki JM, Fowler J, Mackulak GT, Nelson BL, Yang F (2010) Simulation in production planning: an overview with emphasis in recent developments in cycle time estimation. In: Kempf KG, Keskinocak P, Uzsoy R (eds) Planning production and inventories in the extended enterprise: a state of the art handbook, vol 1. Springer, New York, pp 565–592
2. Arrow KJ, Karlin S, Scarf H (1958) Studies in the mathematical theory of inventory and production. Stanford University Press, Stanford, CA
3. Aurand S, Miller P (1997) The operating curve: a method to measure and benchmark manufacturing line productivity. In: IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp 391–397
4. Bechte W (1980) Steuerung der Durchlaufzeit durch Belastungsorientierte Auftragsfreigabe bei Werkstattfertigung. TU Hanover, Hanover
5. Bechte W (1988) Theory and practice of load-oriented manufacturing control. Int J Prod Res 26(3):375–395