1. B. L. Baburin, V. G. Lebedev, and A. V. Solov’ev, “Hydroelectric pumped-storage power plants in GDR,” Énerg. Stroit. za Rubezhom, No. 3, 32 – 38 (1969).
2. B. L. Baburin and I. I. Fain, Economic Feasibility of Hydropower Construction [in Russian], Énergiya, Moscow (1975).
3. T. Gaal, “Experience in the construction and management of a gas-turbine electric power station in Hungary,” Élektr. Stantsii, No. 7, 38 – 43 (1976).
4. L. A. Melent’ev and K. D. Lavrenenko, “Efficient equipment for intermediate- and peak-load operation of electric-power systems,” Teploénergetika, No. 3, 2 – 6 (1971).
5. G. G. Ol’khovskii, I. S. Bodrov, V. G. Filimoshkin, and A. V. Sichevoi, “Some results from the operation and testing of 100,000 kW prototype gas-turbine plant,” Élektr. Stantsii, No. 7, 9 – 12 (1975).