1. A. M. Fedoseev and M. A. Fedoseev, Relay Protection of Electric Power Systems. Handbook [in Russian], Énergoatomizdat, Moscow (1992).
2. Concept of “Digital Transformation 2030” [in Russian], PJSC «Rosseti Moscow Region», Moscow (2018). http://rossetivolga.ru/i/files/2019/2/7/kontseptsiya_tsifrovaya_transformatsiya_2030.pdf
3. The innovation development program of PJSC “Rosseti Moscow Region” for the period of 2016 – 2020 with a perspective until 2025 [in Russian], PJSC «Rosseti Moscow Region», Moscow (2016). https://www.rosseti.ru/investment/policy_innovation_development/doc/innovation_program.pdf
4. STO 34.01-21-004-2019. Digital Power Center. Requirements for the Technological Design of 110 – 220 kV Digital Substations and 35 kV node digital substations. Introduced 29.03.2019 [in Russian], PJSC «Rosseti Moscow Region», Moscow (2019).
5. STO 34.01-21-005–2019. Digital Electric Grid. Requirements for the Design of 0.4 – 220 kV Digital Distribution Electric Grids. Introduced 29.03.2019 [in Russian], PJSC «Rosseti Moscow Region», Moscow (2019).