1. Arnold JG, Williams JR, Maidment DR (1995) Continuous-time water and sediment-routing model for large basins. J Hydraul Eng 121:171–183
2. Azamathulla HM, Wu F-C, Ghani AA, Narulkar S, Zakaria NA, Chang CK (2008) Comparison between genetic algorithm and linear programming approach for real time operation. J Hydro-Environ Res, IAHR APD 2:171–180
3. Electric Power Planning Group of China (2002) Electric power planning of China. Water Resource and Electric Power Publishing House. (in Chinese):23–158
4. Fan JH (2007) The operating simulation of cascade reservoirs and it’s impacts on river eco-environment—a case study on upper reaches of the Yangtze River. Degree of Ph.D. The Graduate School of Chinese Academy of Sciences, 1–48
5. Fontaine TA, Cruickshank TS, Arnold JG, Hotchkiss RH (2002) Development of a snowfall-snowmelt routine for mountainous terrain for the soil water assessment tool (SWAT). J Hydrol 262. doi: 10.1016/S0022-1694(02)00029-X