Author:
Li Ji-Qing,Mariño Miguel A.,Ji Chang-Ming,Zhang Yu-Shan
Publisher
Springer Science and Business Media LLC
Subject
Water Science and Technology,Civil and Structural Engineering
Reference28 articles.
1. Bi Y-X, Li Z-H (2004) Corporate reform and restructuring of China largest hydro power enterprise. In: Innovation and entrepreneurship for sustainable development, Proceedings of IEEE international engineering management conference, vol 1, 18–21, Singapore, Oct 2004, pp 158–162
2. Birger M, Anders G, Asbjorn G (2001) Integrated risk management of hydro power scheduling and contract management. IEEE Trans Power Syst 16(2):216–221. doi: 10.1109/59.918289
3. Cabero J, Baillo A, Cerisola S, Ventosa M, Garcia-Alcalde A, Peran F, Relano G (2005) A medium-term integrated risk management model for a hydrothermal generation company. IEEE Trans Power Syst 20(3):1379–1388. doi: 10.1109/TPWRS.2005.851934
4. Candelliere A, Giuliano G, Nicolosi V, Tossi G (2003) Optimal short-term operation of a multipurpose reservoir system under limited water supply. In: Blöschl G, Franks S, Kumagai M, Musiake K, Rosbjerg D (eds) Water resources system-hydrological risk, management and development, IAHS Publication No. 281, Wallingford, U.K., pp 200–207
5. Chen S-L (2001) Study of basic theories and automation system of reservoir group. Dissertation, Wuhan University, Wuhan, China
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献