Funder
National Key R&D Program of China
National Natural Science Foundation of China
Science and Technology Project of Huaneng Group Headquarters
Publisher
Springer Science and Business Media LLC
Subject
Water Science and Technology,Civil and Structural Engineering
Reference21 articles.
1. Alehu BA, Bitana SGJEP (2023) Assessment of climate change impact on water balance of Lake Hawassa Catchment. Environ Processes 10(1):14
2. Chen J, Zhong PA, Liu WF, Wan XY, Yeh WWG (2020) A multi-objective risk management model for real-time flood control optimal operation of a parallel reservoir system. J Hydrol 590:14
3. Choo TH, Huh JY, Yoon HC, Yun GS, Son JK (2016) Method for new conceptual securing water resources: a case study of the Miryang multipurpose dam in Korea. Environ Earth Sci 75(10):18
4. Fathian F, Ahmadzadeh H, Mansouri B, Vaheddoost B (2022) Assessment of water demand reliability using SWAT and RIBASIM models with respect to climate change and operational water projects. Agric Water Manage 261:11
5. Fayaed SS, El-Shafie A, Jaafar O (2013) Reservoir-system simulation and optimization techniques. Stoch Env Res Risk Assess 27(7):1751–1772
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献