Author:
Almeida Ana,Marreiros Goreti
Reference24 articles.
1. Aarts, E. and Lenstra, J. K. Local Search in Combinatorial Optimization, Wiley, Chichester, 1997
2. Adams, J., Egon B. and Zawack, D. The Shifting Bottleneck Procedure for Job Shop Scheduling. Management Science, Vol. 34, no 3 Março, USA, 1988.
3. Almeida, A; C. Ramos and C. Silvio. Toward Dynamic Scheduling of Manufacturing. the International Journal for Manufacturing Science & Production, Freund Publishing House, 2002.
4. Ashour, S. A Decomposition Approach for the Machine Scheduling Problem, International Journal of Production Research 6(2), 109–122, 1967.
5. Baker, K. R. Introduction to Sequencing and Scheduling, John Wiley & Sons, 1974.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Collaboration and Adaptation in Scheduling;Establishing the Foundation of Collaborative Networks;2007