1. Foo, Y.P. and Takefuji,Y., Stochastich neural network for solving job sho scheduling, Proc. of the IEEE 2nd International Conference on Neural Networks, San Diego, June 1988.
2. Hopfield, J.J., Tank, D.W., Neural Coputation of Decisions in Optimization Problems, Biol. Cybernetics, Vol. 52, 1985, pp. 141–152.
3. Khaw, J.F.C., Lim, B.S., Lim, L.E.N., Scheduling a Group Technology Manufacturing Cell Using a Hybrid Neural Network, Int. Journal of Flexible Automation and Integrated Manufacturing, Vol. 1, No. 2, 1993, pp. 105–117
4. Jones, A.T., Rabelo, Luis C., Real-Time Decision Making Using Neural Nets, Simulation, and Genetic Algorithms, International Journal of Flexible Automation and Integrated Manufacturing, Vol. 1, No. 2, 1993, pp. 119–131.
5. Lin, G.Y.J., Solberg, J.J., Integrated Shop Floor Control Using Autonomous Agents, IIe Transactions, 1992, Vol. 24, No. 3, pp. 57–71.