1. Archiméde B, Coudert T. A Multi-Agent Scheduling Approach for the Flexible Manufacturing Production Systems. IFAC Workshop on Distributed Computer Control Systems, DCCS’98, Como, Italy, September 9–11, 1998.
2. Brandolese M, Franci M, Pozzetti A. Production and maintenance integrated planning. International Journal of Production research, vol. 34, n°7, 1996.
3. Coudert T, Archiméde B, Grabot B. Un système multi-agents pour la coopération Production/maintenance. Actes de la deuxième conférence francophone de Modélisation et SIMulation (MOSIM’99), Eds: Georges Habchi and Alain Haurat, Publications of SCS International, Annecy, October 6–8, 1999.
4. Erschler J, Roubellat F, Vernhes JP. Finding some essential characteristics of the feasible solutions for a scheduling problem. Operations Research, n°24, 1976.
5. Ishii H. Scheduling Problems with Fuzzy Constraints. in Scheduling Under Fuzziness, R. Slowinski and M. Hapke Eds, Physica-Verlag, Heidelberg, 2000.