1. Anadlaft, N., Andalaft, P., Guignard, M., Magendzo, A., Wainer, A., and Weintraub, A., 2003, A problem of forest harvesting and road building solved through model strengthening and lagrangean relaxation, Operations Research 51: 613–628.
2. Andleman, S.J., Ball, I., Davis, F.W., and Stoms, D.M., 1999, SITES V: an analytical toolbox for designing ecoregional conservation portfolios, Manual prepared for the Nature Conservancy: 1–43.
3. Bare, B.B. and Field, R., 1987, An evaluation of FORPLAN from an operations research perspective, USDA Forest Service General Technical Report RM-140, Fort Collins, CO.
4. Buongiorno, J. and Svanqvist, N., 1982, A separable goal-programming model of the Indonesian forestry sector, Forest Ecology and Management 4: 67–78.
5. Carroll, B., Landrum, V., and Pious, L., 1995, Timber harvest scheduling with adjacency constraints: using ARC/INFO to make Forplan realistic, in 1995 ESRI User Conference Proceedings, Redlands, California, USA (
http://www.esri.com/base/common/userconf/proc95/prochome.html
).