1. Asad, M.W.A., (2005). Cutoff grade optimization algorithm for open pit mining operations with consideration of dynamic metal price and cost escalation during mine life, Proceedings of the 32nd. International symposium on the application of computers and operations research in the mineral industry (APCOM), 273–277.
2. Baird, B. K.; Satchwell, P. C., (2001). Application of economic parameters and cut-offs during and after pit optimization, Min. Eng-Littleton, SME, 33–40.
3. Camus, J. P., (2002). Management of mineral resources: creating value in the mining business, SME, Littleton
4. Cross, C., (2005). A Rio Tinto view of collaborative research in Europe and the World, Research co-operation in mining, presentation, 16th. Society of Mining Professors (SOMP) annual general meeting, Ankara, Turkey.
5. Dagdelen, K.; Kawahata, K., (2007). Cut-off grade optimization for large scale multi-mine, multi-process mining operations, Proceedings of the 16th. International symposium on mine planning and equipment selection (MPES) and the 10th. International symposium on environmental issues and waste management in energy and mineral production (SWEMP), Held Jointly in Bangkok, Thailand, 226–233.