1. Franca PM, Gupta JND, Mendes PM, Veltink KJ (2005) Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups. Comput Ind Eng 20:1–16
2. Hollander M, Wolfe DA (1973) Nonparametric statistical methods. Wiley, New York
3. Jósvai J (2009) Production process modeling and planning with simulation method, mounting process optimisation. In: The international conference on modeling and applied simulation, 23–25 Sept 2009, Spain. Universidad de La Laguna, Spain, pp 240–245
4. Pan CH (1997) A study of integer programming formulations for scheduling problems. Int J Syst Sci 28:33–41
5. Pinedo M (2008) Scheduling theory, algorithms, and systems. Prentice-Hall, Englewood Cliffs