1. Preparation of Fully Developed Safety Cases in Response to the NΠ Safety Audit, P W Ball, The Nuclear Engineer, Vol. 30, No. 2, pp34–40, 1989.
2. Magnox Safety Review: Extending the Life of Britain’s Work Horses, Nuclear Energy, Vol. 28, No. 4, pp215–220, 1989.
3. Failure Classification with respect to Detection, A Bondavalli, L Simoncini, First Year Report: ESPRIT BRA Project 3092: Predictably Dependable Computing Systems, May 1990.
4. An Integrated Toolset for Software Safety Analysis, P Fenelon, J A McDermid, Journal of Systems and Software, Vol. 13, pp2–16, 1993.
5. Shutting down five reactors: reasons why and lessons learnt, L Hogberg, Nuclear Europe Worldscan, Vol. 1, No. 2, pp42–43, 1994.