Author:
Pelcat Maxime,Aridhi Slaheddine,Piat Jonathan,Nezan Jean-François
Reference16 articles.
1. Bell D, Wood G (2009) Multicore programming guide. Technical report, Texas Instruments
2. He Y, jing Hsu W, Leiserson CE (2006) Provably efficient two-level adaptive scheduling.
http://citeseerx.ist.psu.edu/viewdoc/summary?
doi:
10.1.1.94.7729
3. Ha S, Lee EA (1997) Compile-time scheduling of dynamic constructs in dataflow program graphs. IEEE Trans Comput 46:768–778
4. Grandpierre T, Sorel Y (2003) From algorithm and architecture specifications to automatic generation of distributed real-time executives: a seamless flow of graphs transformations. In: MEMOCODE ’03, pp. 123–132, 2003
5. Piat J, Bhattacharyya SS, Pelcat M, Raulet M (2009) Multi-core code generation from interface based hierarchy. DASIP 2009
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献