Author:
Wognum Nel,Curran Richard
Reference31 articles.
1. Ainscough M, Yasdani B (2000) Concurrent Engineering with British Industry. Concurrent Engineering 8: 1, 2-11.
2. Beelaerts van Blokland, W.W.A., Verhagen, W.J.C., Santema, S.C. (2008), The effects of co-innovation on the value-time curve, J of Business Market Mngt, Vol.2, No. 1, pp. 5-24.
3. Beelaerts van Blokland, WWA, van der Meer, O, and R Rakers (2010) Co-innovation and the Value-time Curve: A Case Study on the Dassault Falcon 7X and Embraer 170/190 Series, New World Situation: New Directions in Concurrent Engineering 2010, Part 7, 441-449.
4. Bergstrom RP (1990) Assembly, promises & simultaneous engineering. Prod 102: 2, 50-56.
5. Chen Y-M, Liang M-W (2010) Design and implementation of a collaborative engineering information system for allied concurrent engineering. Int J Comp Int Manuf 13: 1, 11-30.