1. Stoessl M, Helbig D, Schweiger E (2022) Resilient substations—concepts and applications. Paper, IEEE PES T&D conference, New Orleans
2. Bose S, Ettl C, Riegler S, Schweiger E, Stoessl M (2018) Recommendation of site commissioning tests for rapid recovery transformers with an installation time less than 30 hours. Presented at CIGRE A2-204, Paris
3. Schweiger E, Stoessl M (2021) Pretact EcoSafeT™ substation concept. Siemens Energy
4. IEEE C57.156-2016—IEEE Guide for Tank Rupture Mitigation of Liquid-Immersed Power Transformers and Reactors, IEEE 2016
5. Dastousa J‑B, Taschlerb E, Bélangera S, Sarib M (2017) A comparison of numerical methods for modeling overpressure effects from low impedance faults in power transformers. CIGRE 4th International Colloquium “Transformer Research and Asset Management, Pula