1. Asfahl, C.R.,Robots and Manufacturing Automation, John Wiley and Sons, Inc., New York, NY (1985).
2. Baumann, W., Birner, R., Haensler, J., Hartmann, R.P., and Stevens, A.G., ?Operating and Idle Times for Cyclic Multi-Machine Servicing,?The Industrial Robot, pp. 44?49 (March 1981).
3. Blazewicz, J., Sethi, S.P., and Sriskandarajah, C., ?Scheduling of Robot Moves and Parts in a Robotic Cell,?Proceedings of the Third ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications, Ann Arbor, MI, K.E. Stecke and R. Suri (Eds.), Elsevier Science Publishers B.V., Amsterdam, The Netherlands, pp. 281?286 (August 1989).
4. Chretienne, P., ?The Basic Cyclic Scheduling Problem with Deadlines,?Discrete Applied Mathematics, Vol. 30, pp. 109?123 (1991).
5. Cohen, G., Dubois, D., Quadrat, J.P., and Viot, M., ?A Linear System Theoretic View of Discrete Event Processes and Its Use for Performance Evaluation in Manufacturing,?IEEE Transactions on Automatic Control, Vol. AC-30, No. 3, pp. 210?220 (March 1985).