1. Zhang Chunyuan, ‘Delayed crack instability of concrete’, inProceedings of SEM/RILEM International Conference on Fracture of Concrete and Rock, Houston, Texas, June 1987, edited by S. P. Shah and S. E. Swartz (Springer-Verlag, 1988) p. 611.
2. Yuan, L. W., Liu, Z. G., Zhou, Z. B. and Li, Z. B., ‘Rheological fracture approach of the concrete dam on Zhexi hydropower station in Human’,ibid. Proceedings of SEM/RILEM International Conference on Fracture of Concrete and Rock. Houston, Texas, June 1987, edited by S. P. Shah and S. E. Swartz (Springer-Verlag, 1988), p. 520.
3. Liu, Z. G., Swartz, S. E., Hu, K. K. and Kan, Y. C., ‘Timedependent response andfracture of plain concrete beams’,Proceedings of the International Conference on Recent Developments in the Fracture of Concrete and Rock, University of Wales, Cardiff, UK, edited by S. P. Shah, S. E. Swartz and B. Barr (Elsevier, 1989) p. 577.
4. Bažant, Z. P., ‘Prediction of concrete creep effects using ageadjusted effective modulus method’,ACI. J.
69 (1972) 212–217.
5. Penev, D., Kawamura, M. and Torii, K., ‘Fracture parameters of soil-cement and lean concrete’, in Informative Abstracts of Chubu Branch Annual Meeting of the JSCE, Gifu, Japan, March 1990, pp. 422–423.