1. Malcolm, D.G., et al.: Application of a technique for research and development program evaluation. Oper. Res. 7 (1959).
https://doi.org/10.1287/opre.7.5.646
2. Roy, D., Roy, R.: Distribution of the activity time in network analysis: a critical revisit with a gamma alternative. Commun. Stat. - Simul. Comput. 42(6), 1288–1297 (2013).
https://doi.org/10.1080/03610918.2012.664231
3. Spanos, A.: Probability Theory and Statistical Inference: Econometric Modeling with Observational Data. Cambridge University Press, Cambridge (1999)
4. Goman, M.: Practical verification of CLT assumption for PERT application. In: Proceedings of the 8th International Scientific Conference on Project Management in the Baltic Countries Project Management Development–Practice and Perspectives, pp. 114–127. University of Latvia, Riga (2019).
https://www.balticpmconference.eu/sites/default/files/image-uploads/Proceeding_book_29.04.2019.pdf
. Accessed 24 Aug 2019
5. Udoumoh, E.F., Ebong, D.W.: A review of activity time distributions in risk analysis. Am. J. Oper. Res. 07(06), 356–371 (2017).
https://doi.org/10.4236/ajor.2017.76027